Message: I studied NEC2008, did a load analysis got a building permit and had inspector come when I put in a 240v, 30a electric vehicle charging station last year. I've had the breaker trip when I had a lot of load on it but not over 70 amps worth. ( house A/C, clothes dryer, electric car...